by Carl Mueller | Dec 31, 2021 | Document Control
When you get a request for proposal with a 20-page document submittal spec, you assume that everything is covered. I mean, you are being told exactly how and how high to jump. As long as you follow the spec, you’ve got it covered. You likely flip though the codes, and...
by Brad Bowyer | Dec 28, 2021 | Document Control
Your document controller just quit in the middle of a project… “One of my document controllers just quit! How can I figure out where they were at with the project?” As a project progresses – especially a long one – the chance that one or...
by Carl Mueller | Dec 24, 2021 | Document Control
Are your document control procedures documented and structured? Every company submitting documents to an engineering, procurement, and construction (EPC) partner faces the same problems: large volumes of manual work, coupled with complex (or unclear) expectations and...
by Carl Mueller | Dec 21, 2021 | Document Control
Paper document storage can be expensive and cumbersome. If project documents are an important part of your work, you already know the value of protecting and storing them. The question is…. How? Also, how long do you have to store them? Paper storage can get...
by Brad Bowyer | Dec 19, 2021 | Product Tips & Tricks
Do you re-submit an entire data book/compilation or just the requested documents if your customer returns comments? This is a question that usually does not have a black or white answer. It really depends on your customers individual preference, in my opinion, one...