by Carl Mueller | Jul 7, 2024 | Blog
DocBoss was built by your industry peers – we know how rigid the rules can be for submitting vendor documentation to engineering companies (and the rejection that comes with it). We guarantee you’ll smile during our demo! Before that though, you might want to take a...
by Carl Mueller | May 5, 2024 | Blog
Below we’ll discuss a number of ways that you can configure your DocBoss account when you work with affiliates. This is handy when you have an affiliate(s) in a different location from you, when you need to add an affiliate or just want to filter your affiliates...
by Carl Mueller | May 3, 2024 | Blog
With DocBoss, you can set the FROM address depending on who you would like the sender to be. This comes in handy if you have multiple projects running and different people running each. That way, the correct person received any return correspondence each time....
by Alina Sonke | Apr 5, 2024 | Document Control
For companies looking for a document control system to submit documentation to Engineering, Procurement, and Construction (EPC) contractors, it’s important to find a system that meets all of your customers’ requirements. With that in mind, there are some...
by Alina Sonke | Mar 27, 2024 | Blog, Document Control, Product Tips & Tricks
For suppliers providing project documentation to EPCs, managing material test reports (MTRs) can be a headache. That’s why having an efficient system for handling Material Test Reports (MTRs) is essential. With DocBoss, you can store MTRs in a shared library...
by Carl Mueller | Jan 25, 2024 | Blog
Here’s a short post that explains some of the main abbreviations we use inside DocBoss for reference dates. Reference Date Abbreviations AS: After shipment (based on ship date on equipment list/major tag) BS: Before shipment (based on ship date on equipment...