Stopping documents from reaching your customer before engineering signs off
Every supplier has a version of this story. Deadline day, the document controller is assembling the submittal, the vessel drawing…
Read NowWhether driven by customer milestones or internal engineering reviews, every issue purpose brings its own revision rules, approval paths, and target dates. DocBoss ties these rules directly to your document codes, so every file routes through the right workflow automatically.
Embed your engineering sequence into every file, enforce critical approval gates automatically, and prevent mid-project handovers or rejections from stalling delivery.
Sequence
Part of the sequence comes from your customer’s specification. The rest comes from how your engineering actually works. Both belong on the document code rather than in somebody’s memory of what this job expects.
Gates
DocBoss enforces two critical gate checks. A document requiring engineer approval never goes out to your customer without it. And a drawing bound for a sub-supplier before manufacturing starts won’t sit forgotten in someone’s inbox.
Rework
A rejection costs you time, and most of that time goes on coordination rather than on the fix: working out who owns it, getting it to them, finding out whether they have done it. That path is mapped before the document comes back.
Language
Where your customer has specified issue purposes and approval codes, their terms appear on everything they see. Where they have not, yours do.
Continuity
People take holidays mid-project. Assignments hand over, temporarily or permanently, and revert on the date you set.
Embed your engineering sequence directly onto your document codes. Schedule a demo to enforce internal review gates, stop unapproved drawings from reaching customers, and automate sub-supplier releases.
Connect customer approval chains, sub-supplier gates, and internal sign-offs into a single automated workflow that never lets a document stall.
Issue cycles run continuously until target return statuses close them, moving documents to the next step. Each stage sets its own target, expected return rules, revision behavior, and due date references.
Internal reviewers status documents as approved, pending, or rejected before submittal queues release them to customers or sub-suppliers. Disagreements defer to the latest status with full review visibility.
Route files sequentially through roles like preparer, checker, and approver. Each stage completes before the next begins, and due dates recalculate automatically as documents advance.
Upload customer comment spreadsheets on return so they travel directly to engineering alongside active drawings. Completed sheets attach to new active files for seamless resubmittal.
Configure customer approval codes using their exact wording and numbering so returned documents are statused in their vocabulary. DocBoss identifies which codes close a cycle and which require resubmission
Automate customer drawing approvals directly into sub-supplier manufacturing releases. Making this a required cycle stage prevents missed handoffs and provides clear proof of release dates.
Add callouts, text, and freehand markups in-browser, or import native PDF comments directly. Choose whether markups export to submittals, comment summary sheets, or spreadsheets.
Handle split tracks, like releasing to fabrication while closing out minor approval changes, simultaneously using temporary parallel documents that merge back into the main record upon completion.
Get answers to questions about DocBoss’s Workflow Management
Whichever of you actually decides it on that job. Some customers specify the issue purposes and the order they run in, down to the codes. Others care only that the right document arrives approved, and the sequence in between is your engineering process. DocBoss holds either, attached to the document code.
Yes. Turn internal approval on for the document types that need it and the document stays out of the customer queue until it carries an approved status.
Yes, and it is a common enough failure to be worth designing for. Make it a stage in the cycle. When the approval lands, the document queues to the sub-supplier automatically instead of depending on somebody remembering, and the record shows when it went.
Get answers to questions about DocBoss’s Workflow Management
Whichever of you actually decides it on that job. Some customers specify the issue purposes and the order they run in, down to the codes. Others care only that the right document arrives approved, and the sequence in between is your engineering process. DocBoss holds either, attached to the document code.
Yes. Turn internal approval on for the document types that need it and the document stays out of the customer queue until it carries an approved status.
Yes, and it is a common enough failure to be worth designing for. Make it a stage in the cycle. When the approval lands, the document queues to the sub-supplier automatically instead of depending on somebody remembering, and the record shows when it went.
Guides to approval cycles, internal review and reviewer routing.
Every supplier has a version of this story. Deadline day, the document controller is assembling the submittal, the vessel drawing…
Read NowIt goes like this. The actuator drawing has been sitting with your customer for two weeks. It finally comes back…
Read Now