






Holding document status across every party on a capital project
On an engineered equipment project, the question that eats the most oxygen is rarely whether a drawing exists. It is…
Read NowHeat exchangers, fired equipment, heating systems, skids, columns, engineered electrical: the document load runs across your own engineering, your fabrication shops, your sub-suppliers and a demanding reviewer on the customer’s side.
DocBoss holds where every document stands across all of them, and turns the approved record into the turnover packages and books the project closes on.
Engineered systems—skids, heat exchangers, fired units, and packaged electrical—carry multi-party document loads across internal engineering, third-party fabricators, and sub-suppliers. DocBoss holds one unified status record across every party while automating tracking, release gates, and skid-sliced turnover packages.
Primarily a vessel shop running under an ASME stamp? See Pressure Vessel & Custom Fabricators. Focusing strictly on rotating machinery? Visit Pump & Compressor Manufacturers.
Track submittals across engineering, fabrication shops, and sub-suppliers through final skid-sliced turnover packages.
Their codes, statuses and formats, plus the list of what the job owes.
Their formats mapped in, a placeholder per tag, skid or grouping for everything the job owes.
Each revision from whichever party produced it.
Cover pages and transmittals generated, due dates and expected returns tracked, downloads confirmed.
Massive stacks of approved drawings, test reports, code reports, and calculations.
One structure, many books: per skid, area, plant or tag, with sections, code reports and calculations where the spec puts them.
Projects with larger equipment span multiple stakeholders: your engineering team, fabrication shops, sub-suppliers, and customer reviewers.
DocBoss maintains a card for every document, which you can track accross parties. Track what is out with each sub-supplier, what remains in internal review, and how long the customer has held each file. Rejections automatically route to assigned action owners and remain gated out of customer queues until internal checks pass.
Third-party fabrication shops and sub-suppliers interact through a dedicated portal to upload deliverables and retrieve returns, keeping files out of email inboxes. Submittals route through engineering, back to sub-suppliers, or into resubmittal queues, backed by targeted expediting reports.
Customer specs often require turnover packages split by skid, area, or plant, complete with code reports and calculations. DocBoss builds multi-section databooks off a single structure using Major Tags, defining each deliverable by document code from your tracked set, or allowing you to arrange documents one by one when a section requires manual sequencing. Final packages compile automatically from the latest approved files.
When projects carry an instrument and valve index, DocBoss uses that equipment data to auto-generate the list of required sub-supplier documents. Instead of engineering tracking incoming vendor records in side-spreadsheets, placeholders build directly inside document control. Incoming sub-supplier docs can be tracked, expedited, hidden from customer submittals, or included exclusively in final databooks.
Bring a live project and your customer specification. See how DocBoss tracks document status across every party from kickoff to final skid-sliced turnover packages.
Answers to your top questions about streamlined engineered equipment documentation
They work through a portal: uploading files into your project, downloading what you send them, and seeing the history of submittals both ways. The per-document tracking, the statuses and the chasing stay on your side.
That route is yours to set. Documents are held out of the customer queue until your reviewers clear them, per document code, in your sequence, and a rejected file can be assigned to several people at once.
The split is a setting on the one structure, not a rebuild. Change the grouping, regenerate the books when you choose to, and the table of contents follows the new layout.
Practical guides on managing sub-supplier workflows, tracking VDRLs, and delivering compliant turnover packages.
On an engineered equipment project, the question that eats the most oxygen is rarely whether a drawing exists. It is…
Read NowThe turnover package is the deliverable with the longest shadow. It arrives at the end of the job, it is…
Read Now



