Select Page

Document Revision Settings In DocBoss

By default DocBoss allows you to manage one revision number (primary doc rev), however you have the ability to manage two by enabling the secondary doc rev. If you want two check of the Enable Secondary Doc Rev. and you can name it accordingly, but there are no...

Accessing Document History In DocBoss

The history of all cards is actively captured in DocBoss. You have the ability to view all previous versions of the document. Clicking the History icon (from the Tools column) will open the History in a new window.    The new window will open and all the history...